Cement plaster calculator (plaster and render)
Enter your walls and ceilings, the plaster thickness and the mix, and get the cement bags and sand for sand-cement plaster or render. Plastering with gypsum, as in the UK? Switch to gypsum plaster for bags of skim or undercoat.
By Aaghaz360 teamReviewed Formula and sources
Calculate
Plaster calculator · aaghaz360.com · printed 02/11/2026
Plaster type
Average thickness, including the extra needed on uneven walls.
Walls and ceilings
Add each wall or ceiling, or enter a total area below. Deduct doors and windows as an area.
A total from drawings, or from the brick calculator.
Mix, wastage and bags1 : 6 · dry factor 1.33 · 50 kg bags
Cement : sand.
1.33 is the usual site allowance for plaster (1.27 with no waste).
Starts at 0 because the 1.33 factor already includes a small allowance.
Cost (optional)Enter your local prices to see a cost. We don't guess prices.
Quantities
- Sand5.8 ft³ · 0.21 yd³ · ≈ 0.26 t
- 0.16 m³
- Wet plasterDry materials 0.19 m³
- 0.14 m³
- Area to plaster
- 12 m²
How this was calculatedShowHide
- Area to plasterSum of length × height= 12 m²
- Wet volume12 m² × 12 mm= 0.14 m³
- Dry volume0.14 m³ × (1 + 0%) × 1.33= 0.19 m³
- Cement0.19 m³ × 1 ÷ 7 × 1,440 kg/m³= 39.4 kg = 0.79 bags → 1
- Sand0.19 m³ × 6 ÷ 7= 0.16 m³
Assumptions
- Wet volume is area × average thickness; the dry-volume factor converts it to loose cement and sand.
- Cement is converted to mass at 1,440 kg/m³. Damp sand bulks and needs more volume.
- Openings are deducted from each face plastered. Reveals, beads and corners aren't counted.
How to calculate cement and sand for plastering
Multiply the area by the plaster thickness to get the wet volume, multiply by about 1.33 for the dry volume, then split it by the mix ratio. The cement share × 1,440 kg/m³ gives kilograms of cement.
Area = length × height × faces − openings Wet volume = area × thickness Dry volume = wet volume × 1.33 × (1 + wastage) Cement, kg = dry volume × cement ÷ (cement + sand) × 1,440 Sand = dry volume × sand ÷ (cement + sand)
The 1.33 factor allows for the voids in loose cement and sand; it's a site convention rather than a value from a standard, and quoted figures run from about 1.27 to 1.35, so the calculator lets you change it. Cement's bulk density of 1,440 kg/m³ is from IS 875 Part 1.
Worked example: a 4 × 3 m internal wall, 12 mm thick
One face of a 4 × 3 m wall is 12 m². At 12 mm that is 0.144 m³ of plaster; in a 1:6 mix it needs 39.4 kg of cement (0.79 of a 50 kg bag) and 0.164 m³ of sand.
- Area: 4 × 3 = 12 m².
- Wet volume: 12 × 0.012 = 0.144 m³.
- Dry volume: 0.144 × 1.33 = 0.1915 m³.
- Cement: 0.1915 × 1 ÷ 7 × 1,440 = 39.4 kg.
- Sand: 0.1915 × 6 ÷ 7 = 0.164 m³ (5.8 cft).
Plaster thickness and mix: what to use
Common site practice is 12 mm on internal walls in a 1:6 mix, 20 mm in two coats outside in 1:4, and 6 mm on ceilings. IS 1661 recommends 10–15 mm for a single coat and caps two-coat work at 20 mm.
IS 1661 lists 1:3, 1:4 and 1:6 cement-sand mixes for plaster, and recommends 1 part cement to 3 or 4 of sand for rough finishes. It says two-coat work should not normally exceed 20 mm, or 15 mm on concrete soffits. The 6 mm ceiling and 12 and 20 mm wall figures are item thicknesses from Indian (CPWD) schedules and site practice, not values from the code; 6 mm is thinner than IS 1661's single-coat range. Uneven brickwork needs more: enter the average thickness you expect.
| Coat | Cement / 10 m² | Sand / 10 m² | Cement / 100 sq ft | Sand / 100 sq ft |
|---|---|---|---|---|
| Ceiling, 6 mm, 1:4 | 23 kg | 0.064 m³ | 21.4 kg | 2.09 cft |
| Internal wall, 12 mm, 1:6 | 32.8 kg | 0.137 m³ | 30.5 kg | 4.49 cft |
| Internal wall, 15 mm, 1:6 | 41 kg | 0.171 m³ | 38.1 kg | 5.61 cft |
| External wall, 20 mm, 1:4 | 76.6 kg | 0.213 m³ | 71.2 kg | 6.98 cft |
Gypsum plaster vs cement plaster (render)
In the UK, "plaster" usually means gypsum plaster on internal walls, and sand-cement on external walls is called render. Gypsum is sold by the bag with a coverage per bag, so the calculator works it out by weight instead of mix ratio.
| Product | Thickness | Weight per m² | Coverage per 25 kg bag |
|---|---|---|---|
| Finish coat (skim), e.g. Thistle Multi-Finish | 2 mm | 2.5 kg/m² | 10 m² |
| Undercoat on brick or block, e.g. Thistle Hardwall | 11 mm | 8.33 kg/m² | 3 m² |
| Undercoat on concrete or low suction, e.g. Thistle Bonding | 11 mm | 9.09 kg/m² | 2.75 m² |
Example: a 2 mm skim over 20 m² uses 50 kg, which is 2 bags of 25 kg. Coverage per bag is British Gypsum's published figure for each Thistle product, as given in the Thistle Hardwall data sheet and repeated by merchants for Multi-Finish and Bonding. For other brands, use the coverage on the bag. Undercoats (Hardwall, Bonding) and the finish coat are separate calculations.
How to use the calculator
Choose cement and sand or gypsum, set the thickness, then add each wall or ceiling, or enter a total area.
- Region presets set the units, the usual cement bag size and, for the UK, gypsum plaster.
- Pick a quick thickness or type your own.
- Add walls with length and height, or ceilings with length and width. Choose Both faces for a partition plastered on each side.
- Deduct doors and windows as an area per wall; it is deducted from each face.
- Coming from the brick calculator? Its wall area arrives as Other area to plaster.
Assumptions and limits
The calculator converts area and thickness into materials. It doesn't account for the surface's suction, bonding agents or beads.
- Thickness is an average; hollow or uneven walls take more.
- Sand is assumed dry. Damp sand bulks and needs more volume.
- Reveals around openings, corners and beads aren't counted.
- Costs appear only for prices you enter.
Next, work out the paint with the paint calculator.
Sources
Constants and limits come from these standards, manufacturers' data and trade bodies. Where practice varies, the calculator lets you change the value.
- IS 1661:1972 Cement and cement-lime plaster finishes on walls and ceilingsBureau of Indian Standards · 1972, reaffirmed
- IS 875 (Part 1):1987 Unit weights of building materials (Table 1)Bureau of Indian Standards · 1987
- Thistle Hardwall product data sheet: coverageBritish Gypsum · current
Found a value that doesn’t match your local practice? Tell us and we’ll review it.
Related calculators
- Brick calculatorBricks, mortar, cement and sand for walls of any size and thickness.
- Paint calculatorLitres or gallons of paint and primer for rooms or walls, and tins.
- Cement, sand and aggregate calculatorCement bags, sand and aggregate for any mix ratio and volume.
- Tile calculatorTiles, boxes, grout and adhesive for floors and walls.
See all construction calculators or price a whole building with the construction cost estimator.
Frequently asked questions
How much cement and sand do I need for 100 sq ft of plaster?
For 12 mm plaster in a 1:6 mix, about 30.5 kg of cement and 4.49 cft of sand. For 20 mm external plaster in 1:4, about 71.2 kg of cement and 6.98 cft of sand.
How much cement for 10 m² of plaster?
About 32.8 kg for 12 mm of 1:6 plaster, with 0.137 m³ of sand, using a dry-volume factor of 1.33.
What is the standard thickness of plaster?
No standard fixes one thickness. Common site practice is 12 mm on internal walls, 15 mm on rough brickwork, 20 mm in two coats on external walls and 6 mm on ceilings. IS 1661 recommends 10–15 mm for a single coat and caps two-coat work at 20 mm.
Which mix ratio is used for plastering?
In site practice, 1:6 is common for internal walls and 1:4 for external walls and render. IS 1661 recommends 1:3 to 1:4 for rough finishes.
How many bags of gypsum plaster do I need?
For a 2 mm skim of Thistle Multi-Finish, about one 25 kg bag per 10 m². For an 11 mm undercoat, about 3 m² per bag of Hardwall and 2.75 m² per bag of Bonding.
What is the difference between plaster and render?
Render is a sand and cement (or lime) coat, usually on external walls. In the UK, plaster normally means a gypsum finish on internal walls; in South Asia, plaster usually means sand-cement work inside and out.
Turn quantities into a tracked budget
Aaghaz360 links purchase orders, site stores and wages to each project, so you can see what you ordered against what you estimated.